feasible schedule meaning in Chinese
可行的计划
可行的进度安排
可行进度
Examples
- , pin } be a feasible schedule of j for the problem 1 , k | di | uj
3问题1 ; k冲1二o存在一个具有肝用结构的最优排序 - We put forward the graphical theory model of jsp , and analyze the cause of unfeasible scheduling and its characteristic , then educe the sufficient and necessary condition that a feasible scheduling solution requires
本文通过作业车间调度问题数学模型的图论形式,深人分析了产生不可行调度的原因及其特徵,得出了一个可行调度的充要条件。 - Difinition 2 . 2 suppose j " j . let " be a scheduling for j " after ( or before ) a time t , we say " is a partly feasible scheduling after ( or before ) a time t for j " , if all jobs are feasible in "
2假设工件集j ’二人对于j ’在某一时刻l之后域之前)进行排序,如果这个排序中的每一个工件都是可行的,则称这个排序为关于工件集j ’在时刻t之后臧之前)的部分可行序 - It is imminent for the seaport to exploit the furthest operation efficiency with feasible scheduling , so it is very significant to make a research on the scheduling of seaport container logistics system
面对日益增长的港口集装箱吞吐量,如何对港口集装箱物流系统进行更加合理有效的规划,以最大限度地发挥其作业能力,是目前急需解决的问题,开展这方面的研究势在必行,具有重大意义。